Case Study: All-weather Construction Shelter
Problem – increase project productivity during the winter on a very windy, river side site.
Solution – Once call to AllSite and we provided a 132’ wide by 115’ long TFS fabric structure designed and engineered to be totally crane-liftable. The structure allowed complete site coverage over a 7 month period allowing difficult foundation work to be completed without interruption.
AllSite Structures supplied this cost effective solution allowing the project to be completed on time and well under budget.
For more information, contact Universal Rentals online or by phone:
Eastern USA: 410-605-9216 / Western USA: 702-699-9195